
Factory Supply 40 Cr Masonry Drill Bits for Concrete and Masonry
Yueqing Hengda Tools Co., Ltd.- Customized:Non-Customized
- Standard:DIN
- Length:75,80,100,120,150 mm
- Type:Masonry Drill Bits
- Material:40cr, Yg8 Tungsten Carbide
- Usage:Masonry Drilling
Base Info
- Model NO.:MDB-01
- Shank Shape:Straight Shank
- Surface Finishing:Sand Blasted, Cr-Coated
- Flute Type:W Flute,U Flute,L Flute
- Transport Package:Carton
- Specification:4*75, 5*80, 6*100, 7*100, 8*120, 10*120MM
- Trademark:Leying
- Origin:Zhejiang
- HS Code:8207509000
- Production Capacity:500000 Pieces,Month
Description
Product:
Brand:
Leying
Size:
4-20MM With Length From 75-600 MM
Raw Material:
40 Cr,YG8C Tungsten Carbide
Flute Shape:
W Flute, U Flute, L Flute
Tin Type:
Slotted Tip,Cross Tip
Standard:
DIN8039
Application:
Concrete, Masonry,Cement, Brick
Brief Introduction
1.Fits all hammer drills with 3-jaw or Jacobs chuck2.Chrome vanadium shaft through-hardened to 50-53HRC
3.Hot isostaticlly pressed to extend life and resist breakage
4.Copper braze material gives high heat resistance for reduced tip loss
5.Special flute geometry removes dust from the hole quicker for fast drilling and long life
Products Details
Workshop & Testing Lab
Exhibition
Packing & Shipping
Packing: Inner package: PVC Box ; Outer package: Cartons
Shipping: By air or by sea(FOB port:Shanghai/Ningbo),by express (DHL,UPS,TNT,FEDEX)
FAQ
1. Q: Is OEM available?
A: Yes,OEM and customization are availble. Also, we can provide label printing service.
2. Q: Are samples available?
A: Yes, you can ask some samples for testing after confirming our prices, but please pay the freight fee,
the fee will be returned to you after you making official order.
3. Q: What is your payment terms?
A: T/T,L/C,Paypal for different circumstances.
4. Q: What's your deliver way?
A: Express delivery, air shipping, sea shipping are available for your request.
5. Q: What's your delivery time?
A: Usual delivery time is 20-30 days after receiving the advance payment.
For the customized product, the delivery time is 35-45 days after receiving the advance payment.