
Ming Drilling DTH Hammer DHD, SD, Ql, Mission, Numa, Cop Shank
WUHAN KINGDRILLING DIAMOND CO., LTD.- Customized:Customized
- Standard:SGS
- Type:Drilling
- Material:High Carbon Steel
- Usage:Well Drilling
- Model No:Mh120p
Base Info
- Model NO.:MH120P
- Processing Type:Forging
- Application:Mining,Water Wells,Geothermal Wells, Building, etc
- Surface Treatment:Spray-Paint
- Payment Terms:L,C, T,T, Western Union
- Air Consumption:High Air Pressure
- Shank Type:DHD340
- Transport Package:Wooden Case
- Trademark:MING
- Origin:China
- HS Code:8431432000
- Production Capacity:5000PCS,Year
Description
Air ConsumptionWeight
(Kg) MH100P SD10 225 254~305 1568 API6-5/8"REG 10~25 10.3BAR/150PSI-711CFM 13.8BAR/200PSI-1067CFM 15.2BAR/225PSI-1422CFM 336 MH120P N120,N125,SD12 275 302~460 1880 API6-5/8"REG 7~25 6.9BAR/100PSI-700CFM 13.8BAR/200PSI-1575CFM 15.2BAR/225PSI-1925CFM 700 MH180P N180, SD18 410 460~660 2210 API8-5/8"REG 7~25 6.9BAR/100PSI-1200CFM 13.8BAR/200PSI-2200CFM 15.2BAR/225PSI-3000CFM 1700 MH240P N240 525 610~860 2300 API8-5/8"REG 7~25 6.9BAR/100PSI-2000CFM 13.8BAR/200PSI-6000CFM 15.2BAR/225PSI-7000CFM 2680 MH240PS N240S 525 860~1100 2600 120H HEX PIN 7~25 6.9BAR/100PSI-2000CFM 13.8BAR/200PSI-6000CFM 15.2BAR/225PSI-7000CFM 3200 MH330P M330 718 900~1200 2100 240 HEX PIN 7~25 6.9BAR/100PSI-2625CFM 10.3BAR/150PSI-4900CFM 13.8BAR/200PSI-7700CFM 5500 How to order?
Shank Type + Top Sub Thread + (With/Without Valve, if this parameter is optional)
FAQ:
1. How about the common packing?
A: If there is no special packing demand, we will take it as our normal packing. First in small carton, and then put in the bigger carton together to make sure goods completed.
2. How to control quality?
A: We have our own experienced QC team,there will be strict inspection and testing for each order before shipping out.
3. Fast delivery time:
A: Usually it takes 25 days for production.only 3 or 5 days if we have stock of your request size.Product Application:
Transport:

Package and Delivery:
Packed by Carton or Wooden cases.
Delivery:

(Kg)
Shank Type + Top Sub Thread + (With/Without Valve, if this parameter is optional)
FAQ:
1. How about the common packing?
A: If there is no special packing demand, we will take it as our normal packing. First in small carton, and then put in the bigger carton together to make sure goods completed.
2. How to control quality?
A: We have our own experienced QC team,there will be strict inspection and testing for each order before shipping out.
3. Fast delivery time:
A: Usually it takes 25 days for production.only 3 or 5 days if we have stock of your request size.Product Application:

Transport:

Package and Delivery:
Packed by Carton or Wooden cases.
Delivery:
- Goods in stock can be delivered within 5 days.
- DTH Bits production time is about 15 days.
- DTH Hammer product time is about 30 days.
